David Case Pavilion

View project information


In a bid to modernise their sporting facilities at Chesham Fields, the school embarked on a fundraising exercise to subsidise the design and construction of this brand new facility. The ‘David Case’ Pavilion will sit alongside the existing 1940s memorial pavilion.

We were appointed to undertake the initial energy assessment, and the M&E designs for the new 2,369 ft² pavilion. Arranged over 2-storeys, the completed pavilion accommodates new changing rooms, first-aid amenities, secure equipment storage and high standard hospitality and catering facilities.

Our designs have maximised passive ventilation and cooling techniques; this is most notable in our re-purposing of the iconic clock tower from the 1940s pavilion to function as a natural ventilation stack for the hospitality area of the David Case pavilion. Air-source renewables deliver the entire site’s heating and hot water requirements, and provisions have been made for off-grid drainage.

Energy efficient LED lighting has been used throughout, with sophisticated PIR and absence-detection lighting controls. Heating is delivered via an under-floor system, and the pavilion’s new facilities are protected with robust fire and intruder alarms.


CLIENT:   Berkhamsted School

Contact us

SVM Head Office

Chiltern House, 184 High Street
Berkhamsted, Hertfordshire, HP4 3AP

Tel: 01442 869369
Email: svm@svm.co.uk

SVM Edinburgh Office

The Matrix, 64 Newhaven Road
Edinburgh, EH6 5QB

Tel: 0131 554 3666
Email: svm@svm.co.uk

Associated Offices in:

Birmingham

Ireland